The public hearing for Ruggirello Solar, a two-megawatt solar facility on St. Andrews Road in Walden, was extended to March 25.
The utility-scale solar facility contains 7.4 acres of panels and is capable of powering between 300 and 500 homes in the Central Hudson District.
The public hearing will be at town hall on March 25 at 7:30 p.m.